Machine Logs → OEE & Downtime
Pain PointShift sheets and system exports are both available, but stitching them together for OEE and downtime means rebuilding the monthly report.
FieldsDate, Machine / line, Planned / actual output, Downtime min / reason, Good / reject qty, QC batch, Material / stock
OutputsOEEdowntime Paretoshift × day outputSPC box